Polavaram project- to provide irrigation benefits to the upland areas
- to provide a water supply to the industries in Visakhapatnam city, including the Steel Plant, for the generation of hydropower
- for the development of navigation and recreation facilities.
The project envisages the construction of an earth-cum-rock filled dam that is 1,600 m long across the Godavari River at Polavaram, and about 42 km upstream of the Godavari Barrage at Dowlaiswaram.
- The P-V link command area features
- Climate and topography
- Geo-hydrological conditions
- Agriculture and irrigation
- Land use
- Groundwater irrigation and conditions
- Cropping pattern
- Crop yields and net returns
- Groundwater model studies: prognosis of change
- Expected crop production benefits from P-V Link
- Sustainability issues of the P-V link command
- Groundwater irrigation
- Waterlogging and soil salinity
- Recommended agriculture strategy under the P-V Link
Groundwater_Externalities_of_Surface_Irrigation_Transfers__National_River_Linking_Project__Polavaram_Vijayawada_Link__IWMI__CGIAR_.pdf
Preview