I am planning to dig a borewell, depth approximately 900 ft. Geologist has suggested the selected spot for water availability. But we have a septic water collection tank with cement rings installed which is approx. 20 ft deep & 5 ft circumference where the bottom is not lined with concrete. The bore well point that we have got is just 1 ft from the pit..
Can we go ahead with the borewell? If not what are the possible solutions?
Ranjan
ranjan_coorg2000@yahoo.com