to provide irrigation benefits to the upland areas
to provide a water supply to the industries in Visakhapatnam city, including the Steel Plant, for the generation of hydropower
for the development of navigation and recreation facilities.
The project envisages the construction of an earth-cum-rock filled dam that is 1,600 m long across the Godavari River at Polavaram, and about 42 km upstream of the Godavari Barrage at Dowlaiswaram.
This paper describes:
The P-V link command area features
Climate and topography
Geo-hydrological conditions
Agriculture and irrigation
Land use
Groundwater irrigation and conditions
Cropping pattern
Crop yields and net returns
Groundwater model studies: prognosis of change
Expected crop production benefits from P-V Link
Sustainability issues of the P-V link command
Groundwater irrigation
Waterlogging and soil salinity
Recommended agriculture strategy under the P-V Link