PLC & SCADA based water quality, treatment & distribution management system for 428 MLD PCMC water supply system
Objective:
To monitor and control from a single point the water quantity, quality, treatment and distribution process in real time for the entire city.From the point the raw water is pumped to the treatment plant to the final distribution points (85 ESRs) the system provides the city engineers data and control pertaining to the electrical efficiency, flow, pressure, level, valve operation, filter operations on a real time basis at a. raw water pumping station b. water treatment plant c. pure water pumping station and d. Elevated Service Reservoirs (ESR).
The SCADA based reporting system allows the city engineers a graphical insight into the flow, level, pressure & efficiency monitoring along with insights into possible issues on a day to day basis.
Use of the historical data, set benchmarks for various supply parameters with the suggested corrective measures allows formulation of corrective strategies to achieve water quality, primary and secondary distribution targets.